Showing posts with label candling. Show all posts
Showing posts with label candling. Show all posts

Friday, December 22, 2017

2017-11-26 - Sunday - Salt kiln firing

Sunday we loaded the salt kiln and started it candling for firing on Monday. Something is always happening at Clayworks.


Edge of the shelf on the loading dock.

Steam coming off the roof of the kiln.



.

Saturday, November 18, 2017

2017-10-25 - Wednesday - Scummy

While the glazed pots sat on the shelf overnight the soluble salts surfaced in the shino glaze in what we call "scumming up". The salt crystals trap the carbon during the reduction firing making the shinos work, so scumming up is a good thing.



We finished loading the kiln and started candling it for tomorrow's firing. When I left it was up to 573 F with a long way to go.



.

Monday, October 31, 2016

2016-10-02 - Sunday - Raku and gas kiln = busy day

Sunday we were loading the gas kiln and while waiting for Jeff to finish glazing his work I fired some of the raku pots I've been making.

Raku paraphernalia all ready to go.

While waiting for the raku kiln to heat the first load
I glazed some more raku pots for another firing.

First couple of loads with underglaze and clear crackle.

During the raku firing I also made my first ever cone 10 cone packs. I know! The people I fired with always made them. Now I've done it too.

My first cone packs.

Another batch of raku, mostly luster glazes.

Same pots, other side.



This video is of the second batch of clear crackle pots
that Deborah helped me with by spritzing the pots
with water to promote crackling.



Finally it was time to start loading the gas kiln. We had a fairly loose pack due to Jeff needing to get some plates fired (and that we didn't have enough work for a tight pack). And here I thought I was making too much work...

Back stack.

Front stack (along with my cone packs)
and you can see by the flames that we started
"candling" the kiln.

By the time I left, the temperature was up to 866 F.
It will go to 1590 F and hold until
the morning when we start the firing process.



.

Monday, September 21, 2015

2015-09-17 - Thursday - Bisque kiln

Thursday morning I went to Clayworks to load the big oval kiln with Kimberly. We filled it, set it to candle for eight hours (some of the pots were pretty damp), and I left to do my day job.

Thursday night I went back and made a face column and some bottles out of craggy crunch clay.

When I left, I checked the kiln and it was way past candling, into the firing schedule and up to 782 degrees. If those damp pots were going to explode they would have done it when the temperature got past 212. Cross your fingers...

Bottles and a face column.

Climbing kiln.

It's pretty large.


.

Sunday, August 23, 2015

2015-08-07 - Friday - Load the kiln

Friday night Kim and I loaded the kiln and started it candling. I was a pretty easy load and we knew we had a long day of firing on Saturday. We were also looking forward to the results on Monday.






.

Tuesday, March 31, 2015

2015-03-23 - Monday - Loading the gas kiln

Monday I met Kimberly at Clayworks to help her load the gas kiln. As always, it was fun work and we had a lot of laughs while getting it done. We started it candling and Kimberly will fire it tomorrow.

Opening the kiln is a lot like Christmas and I plan on being there when it's unloaded on Thursday.



.